Sample deliverables

See exactly what lands in your inbox

One complete document for every deliverable, start to finish. Read it the way you would read your own, then decide whether the number is worth it.

The institution, the spreadsheets, and every figure in these samples are illustrative. Your document is built from your data and carries your facility's name.

What is in itFreePaid
Scores across key dimensions
Your highest-need area named
Ken's written read
PDF you can forward or print
Your own spreadsheets analyzed
Health score and APPA reference check
Findings with dollar impact
Sequenced 90-day plan
Board-ready one-pager
Signed, with a review call

The free FM audit reads your answers. The paid Data Review reads your data.

The backlog priced by system, repair-versus-replace calls, and a four-year roadmap.

Ken Roiland Consulting, LLC

FM Intelligence  ·  Capital & Deferred Maintenance Plan

FY2027 – FY2030

November 2026

Sample document · Illustrative data

Northgate University

Capital & Deferred Maintenance Plan

A $38.4M backlog that costs more every year it waits

Deferred backlog

$38.40M

Replacement value

$412M

Condition index

9.3%

Renewal gap

$6.40M/yr

Section 01

What the plan says

The campus carries $38.4M of deferred maintenance against a $412M current replacement value. That is a Facility Condition Index of 9.3%, which puts the portfolio at the edge of the range most institutions treat as poor, and it is climbing about half a point a year at current funding.

You are renewing $4.1M a year against a sustaining need of roughly $10.5M. That gap is well understood inside the operation. What has been missing is a four-year plan with a dollar figure attached to each building system, which is what this document supplies.

This plan does three things: it prices the backlog by system, it applies repair-versus-replace logic to the three decisions that carry the most money, and it sequences the work across four budget cycles so the condition index improves instead of holding steady. It is built to be funded and executed.

Renewing $4.10M a year against a $10.50M need leaves the backlog growing. Renewing $10.50M holds the index flat; the roadmap below front-loads the peak so it actually falls.

Section 02

The backlog, priced by system

Planning estimates from a walk-through and existing maintenance records, not a stamped engineering assessment.

HVAC & building controls

$11.48M

Poor

Replace chiller plant, retrofit controls

FY2027–28

Largest single share of the backlog and the source of 158 past-due work orders.

Roofing

$6.24M

Poor

Full replacement, 6 of 17 buildings

FY2027

Active leaks in Science Hall and the Library; interior damage is now on the list too.

Building envelope & windows

$4.72M

Fair to poor

Replace sealant, glazing, and 2 curtain walls

FY2028–29

Drives both water intrusion and heating load; pairs with the HVAC work.

Electrical distribution

$3.96M

Fair

Panel and switchgear upgrades, 4 buildings

FY2029

Two panels are at capacity, which is already constraining lab equipment requests.

Interior finishes

$3.18M

Fair

Renew corridors, classrooms, restrooms

FY2030

Appearance-driven; the cheapest way to move the custodial score without adding staff.

Site, roads & utilities

$3.04M

Fair

Paving, storm drainage, exterior lighting

FY2030

Deferred paving compounds fast once the base fails.

Plumbing & piping

$2.88M

Fair

Domestic water and waste line replacement

FY2028–29

Concentrated in three 1960s buildings with original galvanized lines.

Elevators

$1.64M

Fair

Modernize 5 cars, retrofit 2 controllers

FY2030

Two cars are on a monthly service call and one has no parts availability.

Fire & life safety

$1.26M

Good to fair

Alarm panel replacement, sprinkler coverage

FY2027

Pull forward regardless of budget: this is the one category where a delay is a liability.

Section 03

Three calls worth the most money

Repair-versus-replace is a judgment, not a rule. Each call below shows the arithmetic behind it.

Central chiller plant

Two 420-ton machines from 1998. Repairs have cost $186K over three years and the plant was down 11 days last summer.

The mathRepair path: about $70K a year with no reduction in downtime. Replacement: $1.24M, less a $310K utility rebate, so $930K net.

Replace in FY2027. The rebate expires at the end of the fiscal year and the downtime has already reached the point where a hot week closes a building.

Science Hall roof

EPDM membrane from 2003, patched four times in two years. Interior water damage has now spread to two labs.

The mathPatching runs about $84K a year and does not stop the leaks. Full replacement is $610K and ends the interior damage.

Replace in FY2027. Three years of patching costs $252K and leaves you with a $610K bill plus lab repairs.

Library elevators

Original 1996 controllers, reliable cars, obsolete control boards.

The mathController retrofit: $96K, buys 8–10 years. Full modernization: $340K.

Retrofit. This is the case where repair is the right answer, and the plan says so rather than replacing everything on principle.

Section 04

Four budget cycles, sequenced

The condition index falls from 9.3% to 4.2% without a single year that cannot be defended.

FY2027

$9.80M

11 projects · index 7.4%

  • Chiller plant replacement with utility rebate
  • Roofs: Science Hall, Library, Physical Plant
  • Fire alarm panel replacement, 4 buildings

FY2028

$10.60M

9 projects · index 6.1%

  • HVAC controls retrofit across 8 buildings
  • Envelope phase 1: sealant and glazing
  • Domestic water line replacement, 1960s halls

FY2029

$11.20M

10 projects · index 4.9%

  • Envelope phase 2: two curtain walls
  • Electrical distribution: 4 buildings
  • Remaining plumbing and waste lines

FY2030

$9.40M

12 projects · index 4.2%

  • Interior finishes: corridors, classrooms, restrooms
  • Paving, storm drainage, exterior lighting
  • Elevator modernization, 5 cars

Section 05

Where the money comes from

Annual capital renewal line

$6.2M / yr

The base of the plan. Anything less and the index holds flat instead of improving.

Utility rebates and incentives

$310K

Chiller and controls work qualifies; the chiller rebate expires with FY2027.

Deferred maintenance bond or reserve draw

$18.5M

Covers the FY2027–28 peak. Presented to the board as a five-year payback on avoided emergency spend.

Reallocated operating overtime

$95K / yr

From the dispatch and PM changes in the brief. Small, but it funds the PM program that keeps the new equipment new.

Section 06

What waiting costs

  • Construction escalation at 5% a year adds about $1.9M to this backlog annually if nothing moves.
  • Reactive replacement runs roughly 20–30% above planned replacement, before the cost of the disruption that forced it.
  • Two of the nine systems (roofing and electrical) fail in ways that damage other systems, so their deferral cost is not linear.
  • Every year at $4.1M of renewal funding adds about half a point to the condition index, which is the difference between a funded plan and a compounding one.

Section 07

Assumptions and exclusions

  • Backlog values are planning estimates from a walk-through and existing maintenance records, not a stamped engineering assessment. Project-level numbers firm up at design.
  • Current replacement value is carried at $412M, consistent with the insured value on file.
  • Escalation is 5% annually on construction; the roadmap figures include it.
  • The plan assumes no new buildings and no major equipment failure outside the listed scope.

Data basis

Illustrative. The gaps listed below are the kind of holes a real review flags when a client's CMMS or budget export is incomplete.

Gaps in the data

  • Two buildings have no condition assessment on file; their renewal figures are the client's own estimates and are labeled as such.
  • Installation year is recorded for most of the roof area, not all. The remainder is scheduled on age estimates.
  • Cost figures are in current dollars with no escalation applied, since no escalation assumption was supplied.

Illustrative sample. Northgate University is a fictional institution and every figure above is invented to show the structure and depth of a real plan. A real plan is built from your buildings, your records, and your budget cycle.